Category | Industrial |
Construction Program | 20 Working Weeks |
Description:
Involved in the design and construction of this 1265sqm storage warehouse. It was redesigned as a clear span building to eliminate any centre columns and the awning steel was an extension of the roof steel.
The construction used tilt concrete panel with a modern and attractive façade. The warehouse has a 6.5m clearance and four container height electric roller shutters with larger covered loading area.